X2047

EULER LINE INTERCEPT OF LINE X10X_485

< A B C >: Reference Triangle △ABC [ A B ]: Sideline AB (Base c = 1) [ B C ]: Sideline BC (Side a) [ C A ]: Sideline CA (Side b) { 2, 3 }: Euler Line { 10, 485 }: Central Line L(10, 485) { 86, 637 }: Central Line L(86, 637) { 492, 1330 }: Central Line L(492, 1330) { 590, 1834 }: Van Aubel Line { 966, 1587 }: Central Line L(966, 1587) A = Vertex A (0.0000, 0.0000) B = Vertex B (1.0000, 0.0000) C = Vertex C (0.6122, 0.5999) X_2 = CENTROID (0.5374, 0.2000) X_3 = CIRCUMCENTER (0.5000, 0.1021) X_4 = ORTHOCENTER (0.6122, 0.3958) X_10 = SPIEKER CENTER (0.5204, 0.1833) X_485 = VECTEN POINT (0.5773, 0.2578) X_86 = CEVAPOINT OF INCENTER AND CENTROID (0.5534, 0.2171) X_637 = ANTICOMPLEMENT OF X(371) (0.4819, 0.1805) X_492 = CEVAPOINT OF X(2) AND X(488) (0.4893, 0.1483) X_1330 = ANTICOMPLEMENTARY CONJUGATE OF X(1) (0.3908, 0.0300) X_590 = ISOGONAL CONJUGATE OF X(588) (0.6000, 0.2672) X_1834 = ZOSMA TRANSFORM OF X(28) (0.5987, 0.2534) X_966 = INTERSECTION OF LINES X(2)X(6) AND X(4)X(9) (0.5191, 0.1803) X_1587 = POINT CASTOR I (0.6026, 0.2943) X_2047 = EULER LINE INTERCEPT OF LINE X(10)X(485) (0.5417, 0.2111) A B C X2 X3 X4 X10 X485 X86 X637 X492 X1330 X590 X1834 X966 X1587 X2047 (a, b, c) = (5, 6, 7) | AB = 1

X2047 (EULER LINE INTERCEPT OF LINE X10X_485) constructed on acute reference triangle \((a, b, c) = (5, 6, 7)\) with unit baseline AB = \(1\).

"""GEOMETOR construction model for X_2047 = EULER LINE INTERCEPT OF LINE X_10X_485."""

        from __future__ import annotations

        from pathlib import Path

        import sympy.geometry as spg
        from geometor.model import Model

        from geometor.etc.ops import (
            central_line,
            centroid_of,
            circumcenter_of,
            construct_baseline_triangle,
            create_model,
            eval_trilinear_point,
            point_from_barycentrics,
            promote_point_to_top,
            spieker_center_of,
        )
        from geometor.etc.render import write_center_svg


        def construct_x_02047(
            model: Model, A: spg.Point, B: spg.Point, C: spg.Point
        ) -> spg.Point:
            """Construct X_2047 = EULER LINE INTERCEPT OF LINE X_10X_485 on reference triangle ABC."""
            X_2047 = eval_trilinear_point(model, A, B, C, '((s - r)*cos(A) + (s + r)*cos(B -C))', ID="X_2047", classes=["selected", "target"])
            X_2 = centroid_of(model, A, B, C, ID="X_2", classes=["center"])
            X_3 = circumcenter_of(model, A, B, C, ID="X_3", classes=["center"])
            central_line(model, X_2, X_3, 2, 3)
            X_10 = spieker_center_of(model, A, B, C, ID="X_10", classes=["center", "incident"])
            X_485 = eval_trilinear_point(model, A, B, C, 'sec(A -  pi  /4)', ID="X_485", classes=["center", "incident"])
            central_line(model, X_10, X_485, 10, 485, incident=True)
            X_86 = eval_trilinear_point(model, A, B, C, 'b*c/(b + c)', ID="X_86", classes=["center", "incident"])
            X_637 = point_from_barycentrics(model, A, B, C, 0.40143148, 0.29769606, 0.30087247, ID="X_637", classes=["center", "incident"])
            central_line(model, X_86, X_637, 86, 637, incident=True)
            return promote_point_to_top(model, X_2047)


        def build_model(
            sides: tuple[float, float, float] = (5.0, 6.0, 7.0),
            show_guides: bool = False,
        ) -> Model:
            """Build a `geometor.model.Model` for X_2047 on the given reference triangle."""
            model = create_model('X_2047 = EULER LINE INTERCEPT OF LINE X_10X_485')
            A, B, C = construct_baseline_triangle(model, *sides, show_guides=show_guides)
            construct_x_02047(model, A, B, C)
            return model


        if __name__ == "__main__":
            here = Path(__file__).resolve().parent
            model_acute = build_model((5.0, 6.0, 7.0))
            model_acute.save(str(here / "x-02047.json"))
            write_center_svg(
                model_acute,
                here / "x-02047.svg",
                subtitle="(a, b, c) = (5, 6, 7) | AB = 1",
            )